Floor void
In construction, a floor void is typically a vertical opening or hole that is left in the floor construction either to accommodate services, or allow the installation of a staircase or, as an aesthetic feature.
When services such as pipework, ducts and cables are required to penetrate vertically through a floor construction, a void must be created at the time of construction otherwise costly and disruptive remedial work must be undertaken. To avoid this, architects and engineers usually delineate on their drawings where floor voids are to be located.
With in-situ-poured concrete floors, voids need to be trimmed (with appropriate reinforcement within the floor thickness) around the opening and the necessary formwork installed to create the size and shape of void required. When the concrete is poured and the formwork eventually removed, a void remains.
Small vertical holes can be formed not only by timber boxes, which are usually removed after casting, but also by other materials such as polystyrene and stiff cardboard, which may be left in position.
Sometimes, when no provision for a void has been made, and the concrete has been poured, it is possible (for small service voids), to cut the holes after the concrete is cast. However, this is uneconomical and disruptive.
With precast concrete planks and beams, depending on the size of the void, special factory-made units can incorporate a hole in the beam or plank; alternatively, for larger voids, a system of shorter planks and mild steel supporting straps or trimming beams can be used to ‘trim’ around the edge of the void.
It is generally regarded as good practice not to locate voids too close to columns and beams.
Larger voids within floors can be left for architectural reasons, eg to allow a visual link between two floors, as might be used in a reception area or atrium to open-up the space.
The term floor void can also be used to refer to the horizontal space between a ceiling and the floor above, which may accommodate the floor structure, services and so on. It may also refer to the void between the bottom floor of a building and the ground below, sometimes referred to as a crawl space.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
New Great British Energy partnership launched
Crown estate help to turbocharge energy independence.
ECA Industry Awards 2024 shortlist revealed
22 leading businesses from across the electrotechnical and engineering services sector.
Government unveils Skills England strategy
Skills England to transform opportunities and drive growth.
New Government Hub for York Given Planning Green Light
For up to 2,600 civil servants, due for completion by 2028.
Construction Skills Certification Scheme cards
July update on Professionally Qualified and Academically Qualified Person Cards.
BSRIA Briefing 2024, November 22
Sustainable Futures: Redefining Retrofit for Net Zero Living.
The CLC on driving competency in the retrofit sector
Previously published roadmap on skills for net zero.
The first labour government King's speech in fifteen years
Construction industry reactions, support and some concern.
CIOB Retrofit of Buildings Technical Information Sheet
What retrofit is, the approach to be taken and processes to be followed.
Adapting Historic Buildings for Energy and Carbon Efficiency
Historic England advice note 18, free download published.
10 retrofit projects revisited 10 years after completion.
Information orders, building liability orders and SPVs
Key BSA terms and how they impact special purpose vehicles.
Listed despite problems with its design.
Zen and the art of cycling exploration.
Design Council Homes Taskforce launched
To support government 1.5 million homes target within UK climate commitments.